Construct 02_9276, 2017
Pigment Print
37.4 x 49.2 in
USD 6,000
Shipment from Seoul, Korea
International shipping costs will be calculated
and notified separately after payment.
All artworks will be shipped by airfreight unless otherwise requested.
We provide 100% support for transportation costs over USD 50,000, 30% over USD 30,000, and 15% support over USD 10,000.
Available
Explanation
The thin state of construction waste that constitutes the wall of the building was collected from a construction site constructed with the latest construction method. Wastes function to a certain extent in the process of building completion and fall off from the building. The work captured the image of the building material that was acting as a temporary wall just before it was removed and demolished.
Provenance
Artist Collection, 2022